Shamrock

Shamrock Metal Building

Shamrock

Challenging site located in a small town where receptors are nearby (approximately 750′).
Recip Compressor Building built to Steel Nation’s Phase 3 sound mitigation. Air Handling is a push system. Turbine Building built to Phase 4 sound mitigation, and is also a push air handling system.

  • (1) compressor building hosting (6) Cat 3516’s, has a 25-ton bridge crane
  • (1) turbine compressor building hosting (1) solar turbine (2nd turbine to be installed in 2014)
  • (1) MCC building hosting motor controls and switchgears
  • (1) auxiliary building hosting back-up generator

Similar Client Projects

Chesapeake Pleasant building services pre-engineered metal buildings 3

Chesapeake Pleasant Valley

carrollton compressor metal building

Carrollton

Central Metal Buildings

Central

redd metal building main

Redd

Wilcox CS building services pre-engineered metal buildings

Wilcox