Redd

Redd

Site located in suburban area with receptors (homes, church, businesses) approximately 900′ away. Built to Steel Nation phase 4 sound mitigation system. Air handling designed as a push/pull system due to extremely high heat gains from compressor engines.

  • (1) compressor building hosting (2) dearing 7042’s, with a 10-ton bridge crane
  • (1) sound cave/yard hosting vertical fans
  • (2) independent plenums to enable expulsed air to escape

Similar Client Projects

Chesapeake Pleasant building services pre-engineered metal buildings 3

Chesapeake Pleasant Valley

carrollton compressor metal building

Carrollton

Shamrock Metal Building

Shamrock

Central Metal Buildings

Central

Wilcox CS building services pre-engineered metal buildings

Wilcox