Central

Central

Large scale compression and gas processing facility in a rural environment. Ties into transmission line in northern tier of Pennsylvania. Compressor building built to Steel Nation’s phase 3 sound mitigation. Air handling is a push/pull system. Turbine building built to phase 4 sound mitigation, and is also a push air handling system. Various HVAC systems used for other buildings (offices, MCC)

10 Total Buildings including:

  • (1) compressor building hosting (3) Cat 3612’s, has a 14-ton bridge crane
  • (1) compressor building hosting (1) solar turbine
  • (1) warehouse/office building for compressor technicians
  • (1) air compressor building used for pneumatics
  • (1) auxiliary building hosting backup generator
  • (1) MCC building hosting motor controls and switchgears
  • (4) canopy buildings covering de-hy and other processing machinery

Similar Client Projects

Chesapeake Pleasant building services pre-engineered metal buildings 3

Chesapeake Pleasant Valley

carrollton compressor metal building

Carrollton

Shamrock Metal Building

Shamrock

redd metal building main

Redd

Wilcox CS building services pre-engineered metal buildings

Wilcox